After the Factory Acceptance Test, the automation system is installed and commissioned at the customer’s site. With the assistance of our engineers, the system is installed, cabled and commissioned in full compliance with industrial guidelines. It is handed over to the customer after successful completion of a Site Acceptance Test (SAT)